| MACHINE INSTALLATION |
|
INSTALLATION & TECHNICIAN TRANSFER: l
Seller will dispatch 1-2 qualified
technicians for 1 weeks(6 working days and 1 holiday) to buyer’s factory for machine installation and train buyer’s
worker to operate machines. l Technician fee: USD150. -/per day/per technician l For the first time to set up plant equipment, the charge of round trip air tickets and accommodation of technicians to buyer’s factory will be free. But for “after sell service”, the charge of round trip air tickets and accommodation of technicians to buyer’s factory will be paid by buyer. l
Buyer has to arrange following staff for machine
installation before technician arrival:
a. Unloaded machines from containers unpack and placed the equipment at
proper position in the factory.
b.
Get electrical cable ready from main control box of factory to main switch
of each machine. l
Before seller’s technicians arrive buyer’s
factory and inspect all facility and staff for machines installation, buyer
cannot start any machines running. All power connected to each machine and
turn on power to machines must be under watching of seller’s qualified
technicians. l
Time of commission of all equipment: within 1 week
of working days at buyer’s factory l
Time of training workers: within 1 week of working
days at buyer’s factory. l
To make
training schedule efficiency buyer has to arrange all shift workers of above
each session to get together for training together at buyer’s factory. |
| Additional Term |
| WE KINMAX GROUP GUARANTEE SUPPLY SPORTS SHOE UPPERS (READY TO MOUNTING) AND OUT SOLE 50000 PAIRS EVERY MONTH FROM OUR OWN GROUP CHINA FACTORY CUSTOMER'S OWN SHOE MODELS ARE ALSO ACCEPTABLE. |